• Phone

    86-0371-55888285

  • Address

    No. 392, 16/F, No. 53 Bldg., No. 2, East Hanghai Road, Guancheng District, Zhengzhou, Henan, China (Mainland)

  • E-mail

    k@waimaotong.com

LatestProducts

                            two storey galvanised metal prefabricated warehouse prefab houses china

                            two storey galvanised metal prefabricated warehouse prefab houses china

                            two storey galvanised metal prefabricated warehouse prefab houses china

                            two storey galvanised metal prefabricated warehouse prefab houses china

                            two storey galvanised metal prefabricated warehouse prefab houses china

two storey galvanised metal prefabricated warehouse prefab houses china

two storey galvanised metal prefabricated warehouse prefab houses china,Construction & Real Estate,Real Estate
INQUIRY PRECISE INQUIRY
Description

Overview
Quick Details
Warranty:
2 years
After-sale Service:
Online Technical Support, Onsite Installation, Onsite Training, Onsite Inspection, Free spare parts
Project Solution Capability:
graphic design, 3D model design, total solution for projects, Cross Categories Consolidation, Others
Place of Origin:
Henan, China
Brand Name:
canglong group
Model Number:
canglong warehouse/workshop
Use:
Warehouse, Workshop,Plant, Factory
Product Type:
Steel Structure
Product name:
two storey galvanised metal prefabricated warehouse
Application:
warehouse/workshop/factory
Type:
Light Steel Structure
Material:
Q355 Q235
Standard:
AISI,GB
Certificates:
SGS,CE
Loading:
40 GP/20GP
Roof and wall material:
Sandwich Panel/Color Sheet
Door:
Sliding door,Rolling door
Surface treatment:
Hot Dip Gavalnized
Product Certification certification
CE Certified.
Valid from 2019-02-06 until 2023-09-05
Supply Ability
Supply Ability:
12000 Ton/Tons per Week
Packaging & Delivery
Packaging Details
Packing Details : 1. Conventional packing. 2. According to container size, standard export package. Delivery Details : 7~15 days after recieve deposit.
Port
qingdao port,tianjin port
Lead Time :
Quantity(Square Meters) 1 - 1000 1001 - 3000 3001 - 5000 >5000
Est. Time(days) 20 30 45 To be negotiated
Project Show

two storey galvanised metal prefabricated warehouse prefab houses china

Steel Structure Building Description

main steel frame
H section steel beam and columns, painted or galvanized, galvanized C section or steel pipe
Secondary frame 
hot dip galvanized C purlin , steel bracing , tie bar , knee brace , edge cover etc.
Roof panel 
EPS sandwich panel , glass fiber sandwich panel , rock wool sandwich panel , and PU sandwich panel or steel sheet
Wall panel 
Sandwich Panel or Corrugated Steel Sheet
Tie Rod
Circular Steel Tube
  Brace  Round Bar
Knee Brace
Angle Steel
Roof Gutter
Color Steel Sheet
Drawing
We can make the design and quotation according to your require or your drawing
Certification
ISO9001:2000,CE.
 
Factory Live

two storey galvanised metal prefabricated warehouse prefab houses china

two storey galvanised metal prefabricated warehouse prefab houses china 

Quality is the guarantee of our long-term survival.With us, you can quickly build your blueprint!

Certifications

two storey galvanised metal prefabricated warehouse prefab houses china

Transaction records

two storey galvanised metal prefabricated warehouse prefab houses china

two storey galvanised metal prefabricated warehouse prefab houses china

At present, our products have been exported to more than 70 countries in the world, and have been widely recognized.

Recent Projects

two storey galvanised metal prefabricated warehouse prefab houses china

two storey galvanised metal prefabricated warehouse prefab houses china

 

two storey galvanised metal prefabricated warehouse prefab houses china

Any problems, please click here to contact us.

 

Materials department
  two storey galvanised metal prefabricated warehouse prefab houses china
Packaging & Shipping

two storey galvanised metal prefabricated warehouse prefab houses china

Fixed packing, loading, transportation, unloading the matters needing attention:

(1) The lifting large there must be a person responsible for the use of fixture, suitable, strictly abide by the

rules of lifting, to prevent the occurrence of vibration, impact, deformation or damage, fall in the hoisting process.

(2) At the time of loading, there must be a special supervision, check car number and packing, the car pile

up securely, and to increase the necessary binding component loosening, prevent the loss.

(3) Remained stable in the transport process, the vehicle at the time of shipment, on the long, wide, high object transport, must be trained pilots, escort personnel responsible for, and mark is arranged on a vehicle.

(4) No rough handling, loading and unloading personnel handling, weight, size should be familiar with the components, and check the horse sling, rigging, prevent accidents.

(5) The member to the construction site, timely organization of unloading, stacking area.

(6) The crawler crane carrying member, should pay attention to the surrounding terrain, air condition, prevent the crawler crane overturning and component collision.